Page 276 - Annual Report 2020
P. 276

Iron ore mining operations
          The following table contains additional details of our mining operations. This table should be read in conjunction with the production table
          (refer to section 6.3.1) and reserves table (refer to section 6.4.2).

          Mine &    Means of                     Title, leases         Mine type &              Facilities,
          location  access    Ownership  Operator  or options  History  mineralisation style  Power source  use & condition
          Samarco
          Southeast   Public road  BHP Brasil 50%   Samarco  Samarco’s   Production   Open-cut  Samarco holds   The beneficiation
          Brazil    Conveyor    of Samarco       mining facilities   began at   Itabirites   interests in    plants, pipelines,
                    belts used    Mineração S.A.  administrative   Germano mine  (metamorphic   2 hydroelectric   pellet plants and port
                    to transport   Vale S.A. 50%  embargoes and   in 1977 and    quartz-hematite   power plants,   facilities are intact. A
                    iron ore to                  judicial    at Alegria   rock) and friable   which supply    re-start of operations
                    beneficiation                injunctions have   complex    hematite ores  part of its   is planned during
                    plant                        been lifted, and   in 1992         electricity  FY2021.
                    3 slurry                     restart can occur  Second pellet   Power supply
                    pipelines used               when the    plant built            contract with
                    to transport                 filtration system   in 1997        Cemig Geração
                    concentrate                  is complete and   Third pellet     e Transmissão
                    to pellet plants             all safety   plant, second         expires in 2022
                    on coast                     requirements    concentrator
                    Iron ore pellets             are met.    and second
                    exported via                 In October 2019,   pipeline built
                    port facilities              obtained the   in 2008
                                                 Corrective   Fourth pellet
                                                 Operating   plant, third
                                                 Licence required   concentrator
                                                 to progress   and third
                                                 towards     pipeline built
                                                 operational   in 2014
                                                 restart
                                                 of one
                                                 concentrator
          Coal mining operations
          The following table contains additional details of our mining operations. This table should be read in conjunction with the production table
          (refer to section 6.3.1) and reserves table (refer to section 6.4.2).
          Mine &    Means                        Title, leases         Mine type &              Facilities,
          location  of access  Ownership  Operator  or options  History  mineralisation style  Power source  use & condition
          Cerrejón
          La Guajira   Public road  BHP 33.33%  Cerrejón  Mining leases   Original    Open-cut  Local Colombian  Beneficiation
          province,   Coal exported  Anglo American   expire   mine began   Produces a    power system  facilities: crushing
          Colombia  by company-  33.33%          progressively   producing    medium rank       plant with capacity
                    owned rail to   Glencore 33.33%  from 2028 to   in 1976  bituminous thermal   in excess of 40 Mtpa
                    Puerto Bolivar               early 2034  BHP interest   coal (non-coking,   and washing plant
                    (150 km)                                 acquired    suitable for the       Nominal capacity
                                                             in 2000   export market)           in excess of 3 Mtpa

          Petroleum
          Petroleum operations
          The following table contains additional details of our petroleum operations. This table should be read in conjunction with the production
          table (refer to section 6.3.2) and reserves table (refer to section 6.4.1).
          Operation                                        Title, leases      Nominal       Facilities,
          & location  Product   Ownership        Operator  or options         production capacity  use & condition
          United States
          Offshore Gulf of Mexico
          Neptune (Green Canyon 613)
          Offshore   Oil and gas   BHP 35%       BHP       Lease from US Government    50 Mbbl/d oil   Stand-alone tension
          deepwater             EnVen Energy 30%           as long as oil and gas   50 MMcf/d gas   leg platform (TLP)
          Gulf of Mexico        W&T Offshore 20%           produced in paying quantities
          (1,300 m)             31 Offshore 15%
          Shenzi (Green Canyon 653)
          Offshore   Oil and gas  BHP 44%        BHP       Lease from US Government    100 Mbbl/d oil   Stand-alone TLP
          deepwater             Hess 28%                   as long as oil and gas   50 MMcf/d gas  Genghis Khan field (part of
          Gulf of Mexico        Repsol 28%                 produced in paying quantities    same geological structure)
          (1,310 m)                                                                         tied back to Marco Polo TLP
          Atlantis (Green Canyon 743)
          Offshore   Oil and gas   BHP 44%       BP        Lease from US Government    200 Mbbl/d oil   Moored semi-submersible
          deepwater             BP 56%                     as long as oil and gas   180 MMcf/d gas  platform
          Gulf of Mexico                                   produced in paying quantities
          (2,155 m)
          Mad Dog (Green Canyon 782)
          Offshore   Oil and gas   BHP 23.9%     BP        Lease from US Government    100 Mbbl/d oil   Moored integrated truss
          deepwater             BP 60.5%                   as long as oil and gas   60 MMcf/d gas  spar, facilities for
          Gulf of Mexico        Chevron 15.6%              produced in paying quantities    simultaneous production
          (1,310 m)                                                                         and drilling operations







          274  BHP Annual Report 2020
   271   272   273   274   275   276   277   278   279   280   281