1.6.1 Our people continued


            Case study:
            BHP Operating System










































            The BHP Operating System (BOS) and the Maintenance and   Improving car dumper dump time at WAIO
            Engineering Centre of Excellence (MECoE) are two key priorities   Adopting the BOS and leveraging the MECoE support has
            driving exceptional performance and operational excellence   enabled a sharper focus on sustainable performance and
            through the business.                            enabled the teams across the WAIO supply chain to deliver
            The BOS is a way of working that puts 100 per cent safety for    record production in FY2020. The collective effort and expertise
            our people, 100 per cent value for our customers achieved with   across the WAIO Port operational and functional teams has
            zero per cent waste at the centre of everything we do. It is a   unlocked capability and reduced the car dumper dump time
            business-wide philosophy that guides leadership behaviours    by more than 7 per cent, delivering an improvement value
            and practices, empowers our teams, builds capability and makes   of 2.1 million tonnes per annum (Mtpa).
            problem solving and improvement part of what we do every day.   To achieve this result, BOS principles and practices were
            Three principles underpin the BOS: serve our customers, pursue   established as part of daily interactions with all of our frontline
            operating perfection and empower our people.     teams, which enabled effective problem solving, innovative
            The MECoE was established in 2016 to achieve industry leading   thinking and safe delivery of key metrics. This combined
            performance and outright excellence in maintenance at BHP    with support from the MECoE through the design of total
            by delivering safe, sustainable improvement in our equipment   equipment strategies, planning and scheduling services,
            availability, reliability and cost. To achieve this the MECoE   root cause analysis and data analytics capabilities continues
            focuses on five core elements: establishing the BHP maintenance   to improve performance.
            way, achieving excellence in planning and scheduling,   Escondida concentrator improvement
            establishing total equipment strategies, instilling maintenance
            as a profession and making life easier for our people.   The combined work of our operations, the BOS and MECoE
                                                             has supported the delivery of historic throughput for Escondida
            The advanced analytical techniques of the MECoE identify    concentrators, averaging 371 kilotonnes per day throughout
            what we need to work on to improve performance. By   for the first time equating to 135 Mtpa.
            integrating them with the BOS, we accelerate our cycle of
            continuous improvement. Put simply, the MECoE provides    By bringing together domain knowledge, machine learning and
            us with the ‘what’, the BOS provides us with the ‘how’, and    dynamic simulation modelling, variable drivers were able to be
            a feedback loop is created.                      prioritised in order of value so that defect elimination, strategy
                                                             optimisation and standardised work practices were applied
            During FY2020, the BOS and MECoE have invested in a series    in areas that would impact performance, resulting in some
            of value analytics projects to unlock capacity and improve   significant outcomes.
            performance at BHP. Two prominent examples of their combined
            benefit to the business have been at the car dumper at our Port   The combination of activity from the BOS and MECoE at WAIO
            Hedland operations in Western Australia Iron Ore (WAIO), and the   and Escondida demonstrate the significant value that can be
            uplift at the concentrator at our Escondida mine.  unlocked when they are united, which we are looking to
                                                             replicate in other parts of our business.