Page 305 - Annual Report 2020
P. 305

(1)   Cut-off criteria:                             (5)   Approximate drill hole spacings used to classify the reserves were:
              Deposit  Ore Type    Mineral Resources  Ore Reserves  Deposit  Proved Reserves  Probable Reserves     Strategic Report
              Leinster  OC         ≥ 0.40%Ni     ≥ 0.40%Ni        Leinster  25m x 25m        25m x 50m
                       Disseminated    ≥ 0.40%Ni  −               Mt Keith  40m x 40m        80m x 80m
                       Sulphide                                   Cliffs   25m x 25m         25m x 25m
                       UG          ≥ 1.0%Ni      ≥ 0.90%Ni                 (and development)
                       Oxide       ≥ 1.2%Ni      −                Yakabindie  40m x 60m      80m x 60m
                       SP, SP oxidised  ≥ 0.70%Ni  −              Venus    25m x 25m         50m x 50m
              Mt Keith  Disseminated    Variable between   −   (6)   Ore delivered to the process plant.
                       Sulphide    0.35%Ni and 0.40%Ni         (7)   Metallurgical recoveries for the operations were:
                       SP          Variable between   Variable between   Deposit             Metallurgical Recovery
                                   0.35%Ni and 0.40%Ni  0.35%Ni and
                                   and ≥ 0.18%   0.40%Ni and      Leinster  OC               80%
                                   recoverable Ni  ≥ 0.18%                                                          Governance at BHP
                                                 recoverable Ni   Mt Keith                   63%
                       OC          −             Variable between   Cliffs                   83%
                                                 0.35%Ni and      Yakabindie                 63%
                                                 0.40%Ni and
                                                 ≥ 0.18%          Venus                      88%
                                                 recoverable Ni  (8)   Predicted metallurgical recoveries for the projects were:
              Cliffs   Disseminated    ≥ 0.40%Ni   −
                       Sulphide                                   Deposit                    Metallurgical Recovery
                       Massive Sulphide  Stratigraphic  −         Leinster  UG               88%
                       UG          −             ≥ 1.2%Ni      (9)   Leinster – Ore Reserves includes operations and projects.
              Yakabindie  Disseminated   ≥ 0.40%Ni  −          (10) Leinster – The increase in the OC ore type was due to improved resource
                                                                 classification which enabled increase conversion to Ore Reserves.
                       Sulphide                                  The decrease in the Reserve Life was due to an increase in the nominated   Remuneration Report
                       OC          −             ≥ 0.35%Ni       production rate from 0.6Mtpa to 1.4Mtpa. Incorporated within the Reserve Life
              Venus    Disseminated   ≥ 0.40%Ni  −               calculation were OC and UG ore types, which contribute 3 years and 8 years
                                                                 respectively.
                       Sulphide                                (11)  Mt Keith – The decrease in Ore Reserves was mainly due to depletion.
                       Massive Sulphide  Stratigraphic  −        The increase in Reserve Life was due to a decrease in nominated production
                                                                 rate from 8Mtpa to 6Mtpa.
                       UG          −             ≥ 0.9%Ni      (12)  Cliffs – The increase in Ore Reserves and Reserve Life was mainly due to an
              Jericho  Disseminated   ≥ 0.40%Ni  −               update in the mine design.
                       Sulphide                                (13) Yakabindie – The increase in Ore Reserves was mainly due to an update in the
                                                                 mine design.
           (2)   Leinster – The increase in OC ore type was due to an update in the resource   (14) Venus – The increase in Ore Reserves and Reserve Life was mainly due to
              estimate supported by additional drilling. The decrease in SP ore type was due   changes in mining method from Longhole Open Stope to Sub-Level Cave.
              to depletion.
           (3)   Mt Keith – The decrease in SP ore type was due to depletion.                                       Directors’ Report
           (4)   Venus – The increase in Disseminated Sulphide ore type and decrease in
              Massive Sulphide ore type was due to an update in the resource estimate
              supported by additional drilling.










                                                                                                                    Financial Statements


                                                                                                                   6










                                                                                                                    Additional information


















                                                                                              BHP Annual Report 2020  303  Shareholder information
   300   301   302   303   304   305   306   307   308   309   310